Project Location
Cesar Chavez Park is located on the north portion of the Berkeley Marina. The proposed area for the public restroom is along the north side of Spinnaker Way where currently only portable toilets are available to the public.
WHAT'S HAPPENING
This is a Measure T1 Phase 2 project.
The Cesar Chavez Restroom Project includes the following:
- Restroom: Construction with a prefabricated public restroom, necessary grading and/or retaining wall to create building pad, and utilities installation.
- Site Accessibility: Site accessibility improvements to comply with ADA.
- Miscellaneous site related improvements
Currently the project is in the pre-design and investigation phase, which includes performing investigation and assessing conditions of existing main sewer line for connection, as well as solicitation for a design consultant to prepare the plans and specifications. Construction is anticipated to start in 2025.
Spinnaker Way has recently undergone major pavement, drainage and accessibility improvements where a sewer lateral was installed to accommodate the restroom building at this location.
Upcoming Events
-
Cesar Chavez Perimeter Pathway and Restroom Projects Community Meeting
Event Type: Community Events & Outreach
Date: | 5:00pm - 7:00pm
Location: Virtual
Document